On May 12, the reporter learned from the transportation department of Tongzhou District that after the opening of the park this year, Beijing Universal Studios will unblock the intersections with a radius of 10 kilometers in the surrounding area in batches. In addition, traffic control was implemented around 95 primary and secondary schools and kindergartens, and safety supervision measures were strengthened.
According to reports, after the opening of Universal Studios this year, Tongzhou District will use this as a key area to conduct traffic statistics and analysis on intersections within a radius of 10 kilometers. Analysis of the flow at the intersection along Shengnan Street and the municipal road.
In addition, Tongzhou District will make good use of the results of signal light construction, and through big data analysis of traffic flow, for the long-term congested intersections in the past, through measures such as improving the setting of import and export lanes and optimizing the timing of signal lights, it will effectively alleviate traffic congestion and improve road traffic efficiency. .
The traffic order around the school is also the focus of governance in Tongzhou District this year. This year, about 95 primary and secondary schools and kindergartens within 155 square kilometers will be renovated. The construction includes improving traffic signs and markings around schools, and supplementing public security monitoring for a few schools that lack monitoring facilities. After the project is completed, the passage and parking of vehicles can be regulated, and supervision measures should be strengthened to ensure that law enforcement is based on evidence. At present, the project has entered the site for construction.